1.What is the standard labor time for an order of 1 progress? 8 boards? 200 boards?
STANDARD PRODUCTION TIME roil TIME FOR 1 BOARDLABOUR TIME FOR 8 BOARDSLABOUR TIME FOR 200 BOARDS
OPERATIONSET-UP precedeSET-UPRUNTOTALSET-UPRUNTOTALSET-UPRUNTOTAL
PHASE I: PREPARATION
Artwork Generation290290292902929029
Inspect & Shear200.5200.062520.0625200.520.52012.532.5
Punch Tooling Holes100.5100.062510.0625100.510.51012.522.5
PHASE II: IMAGE TRANSFER
Drill
manual(a)150.08154055153203351580008015
CNC2400.004CNC Drill cannot be applyCNC Drill cannot be used 240400640
Metallization100.75100.0937510.09375100.7510.751018.7528.75
run dry Film Photoresist
Panel Prep50.250.0255.02550.25.25510
Laminate & Expose202200.2520.2520222205070
fortify200.2200.02520.025200.220.220525
plate258.5251.062526.0625258.533.525212.5237.5
Strip DFPR50.250.0255.02550.25.25510
Etch & nominate Strip100.2100.02510.025100.210.210515
PHASE III: FABRICATION
Solder Mask451.5450.187545.1875451.546.54537.582.5
Solder Dip300.5300.062530.0625300.530.53012.542.

Order your essay at Orderessay and get a 100% original and high-quality custom paper within the required time frame.

5
Profile
Punch root on501501515085850200250
CNC Routercl0.51500.5150.51504154150100250
Inspect, Test, Pack451.5451.546.545125745ccc345
AssumptionsProfiling by means of Punch PressProfiling through Punch PressDrilling through CNC Machine
Labor succession in minutes383.38125694.051840.25
Labor Time in hours6.389687511.567530.67083333
?
2.How is Donner doing? What problems do you see? Why do these problems exist?
Donner has to improve its intersection methods in order to compete effectively with other printed circumference board manufacturers. It has to reduce the delay period of deliveries and percentage of orders...If you privation to get a full essay, order it on our website: Orderessay